
The pool at Camp Lakota was dedicated on September 3rd. This is the largest capital project the camp has ever done. The camp has also seen the amount of campers double since word has gotten out that they have a pool. The deck of the pool was built to be enclosed in the future if they do desire. See photos of the September 3rd dedication here. |
![]() |
| To read more about this project, download the press release in PDF format. |
About Us | Site
Map | Contact Us | ©2007
The Association of Pool & Spa Professionals Midwest Chapter